Phase Safe Electrical carries out commercial electrical projects for offices, shops, hospitality venues, warehouses and workshops across New Zealand, from bases in Wellington and Auckland. That covers shop, office and tenancy fitouts, refurbishments, LED and high-bay lighting upgrades, and new installations. We work alongside builders, designers and project managers, plan the work around trading or production, then test and certify everything at handover.
What electrical work does a commercial fitout need?
Most fitouts need new or altered power circuits, lighting to suit the new layout, data cabling and outlets, power and data at counters for point of sale, and a distribution board that can carry the tenancy's load. Refurbishments add stripping out redundant wiring, relocating outlets and upgrading old lighting. The exact scope comes from the design drawings and how the space will be used.
| Project type | Typical electrical scope |
|---|---|
| Retail store | Counter and point-of-sale power, display and feature lighting, signage circuits, data points |
| Office | Workstation power and data, meeting room power, kitchenette circuits, LED lighting with controls |
| Tenancy refurbishment | Strip out redundant wiring, relocate outlets, upgrade lighting and the tenancy board |
How is fitout electrical work staged?
Fitout electrical work runs in stages that have to land at the right point in the builder's programme: early works to isolate and make safe existing circuits, first fix to run cables before walls and ceilings are lined, and fit-off once linings and joinery are in. Testing, connection and certification come last. We price from the drawings and agree dates for each stage with the builder or project manager.
Bring us in while the design is still being drawn. Moving outlets on paper costs nothing; moving them after linings are finished means extra work for several trades.
What does a commercial LED lighting upgrade involve?
An LED upgrade replaces older lamps and fittings, such as T8 fluorescent tubes, metal halide high-bays or halogen downlights, with LED lighting, either by replacing the whole fitting or by retrofitting where the existing fitting suits it. We survey the current lighting, circuits and ceiling heights, propose fittings and controls for each area, then install area by area so the rest of the site stays lit.
EECA, the government's energy efficiency agency, says upgrading to LED lighting can cut lighting energy use by around 40–70%, and by around 60–90% combined with lighting controls. It puts LED life at around 25,000–30,000 hours, against 8,000–12,000 hours for fluorescent tubes. Your savings depend on what you are replacing and how long the lights run.
High-bay or low-bay lighting for warehouses?
High-bay fittings suit tall spaces such as warehouses, distribution centres and large workshops, directing light down from a high ceiling onto the floor and between racking. Low-bay fittings suit lower ceilings, where light needs to spread wider from a shorter distance. Mounting height, racking layout and the tasks below decide which you need, not wattage alone, so the layout is drawn before fittings are bought.
EECA singles out occupancy sensors as a strong energy saver in warehouse aisles and storerooms, where lights are often on with nobody there. Lighting often changes alongside new racking or machinery; our industrial and commercial electrical page covers the power side of that work.
Emergency and exit lighting on a project
Emergency lighting is a specified system under the Building Act 2004, so it needs extra care on any fitout or refurbishment. Electrical work does not normally need a building consent, but section 43 of the Act says energy work on a specified system covered by a compliance schedule does. If emergency lighting or exit signs move as part of a project, the electrical design has to line up with the consented plans.
We install, move and replace emergency and exit lighting and coordinate it with your designer. Once the building is in use, the compliance schedule sets the inspection routine; our BWOF and IQP inspections page explains how that works.
New installations, sub-boards and capacity
New installations cover power and lighting for new buildings, extensions, new tenancies and new plant areas, from the sub-mains and distribution boards to the final circuits and fittings. The first question is whether the existing supply and switchboard can carry the extra load, which is worth answering before the design is finalised.
Adding a kitchen, more workstations, machinery or EV chargers can push an older board past its limit. If the board needs extending or replacing, our page on distribution boards and switchboards explains the options.
What certification do you get at handover?
At handover you receive the certificates the Electricity (Safety) Regulations 2010 require: a Certificate of Compliance for general and high-risk prescribed electrical work, and an Electrical Safety Certificate confirming the installation is safe to connect and use, issued no later than 20 working days after connection. Mains work, such as connecting the mains at a main switchboard, is high-risk work that must also be inspected.
On a fitout, agree early whether the builder, tenant or landlord should receive copies, so nobody is chasing paperwork after practical completion.
Frequently asked questions
Can you work to a tight fitout programme?
We plan our work around the builder's programme and agree dates for each stage before we start. Tell us about fixed dates, such as an opening day or lease start, at quoting stage so the job is resourced properly. If some work can only happen outside normal hours, raise it early so it can be planned into the programme.
Can you refurbish a shop or office that stays open?
Often, yes. We stage the work so only one area is affected at a time, keep isolations short and plan disruptive tasks for quieter periods. Some work, such as replacing a tenancy distribution board, needs a short shutdown, and we agree the timing with you in advance.
Do you supply the LED fittings?
Yes, as part of an installed job. We choose fittings to suit the space, install them, then test and certify the work. We don't sell fittings on their own, so if you only need to buy lights, a lighting wholesaler or retailer is the right place to go.
Do I need an electrician to replace a light fitting at work?
Yes. Replacing a fixed light fitting is electrical work for a licensed electrical worker, not a building maintenance task. Changing a lamp in an existing holder is different from replacing the fitting itself. New circuits, extra fittings or rewiring need a Certificate of Compliance once the work is complete.
Sources
- Efficient lighting for the workplace (EECA)
- Building Act 2004, section 43: building consent for energy work (New Zealand Legislation)
- Building (Specified Systems, Change the Use, and Earthquake-prone Buildings) Regulations 2005, Schedule 1: specified systems (New Zealand Legislation)
- Electricity (Safety) Regulations 2010, regulations 65, 70 and 74C (New Zealand Legislation)