Phase Safe Electrical provides IQP inspection services for the electrical specified systems in commercial and industrial buildings, working for clients across New Zealand from bases in Wellington and Auckland. We inspect, test and maintain systems such as emergency lighting, exit signs and emergency power to the procedures in your compliance schedule, fix what fails, and keep the records your building warrant of fitness (BWOF) relies on each year.
What our BWOF and IQP inspection service covers
The service covers the inspection, maintenance and reporting procedures, often shortened to IMR, that your compliance schedule sets for electrical specified systems. That means routine checks and tests at the intervals the schedule states, repairs when something fails, written records for the logbook and the annual reporting for your BWOF. Tell us which specified systems are on your compliance schedule and we'll confirm what we inspect.
- Emergency lighting (SS4). Routine inspections and tests of emergency luminaires, their batteries and the circuits that feed them, against the standard your compliance schedule names.
- Exit and evacuation signs. Illuminated signs that sit under SS14 or SS15 on the schedule, which can be checked on the same visits as the emergency lighting.
- Emergency power (SS14). Standby power that keeps life-safety systems working when the mains supply fails, such as generator plant serving the systems listed in SS1 to SS13.
- The electrical side of other systems. Supplies, circuits and controls that feed automatic doors, mechanical ventilation, smoke control fans and similar systems, where a specialist in that system maintains the equipment itself.
- Repairs. Failed fittings and batteries, damaged wiring and circuit faults, fixed by our licensed electricians and recorded.
- Records and reporting. Test results for the logbook, written reports and the annual paperwork the owner attaches to the BWOF for the systems we inspect.
Which specified systems involve electrical work?
Emergency lighting (SS4) and emergency power systems and signs (SS14) are the most clearly electrical specified systems. Many others depend on electrical supply and controls to work at all: fire alarms, automatic doors, escape route pressurisation, lifts, mechanical ventilation, smoke control and audio loops. In those cases a specialist in the system often holds the IQP role, and the electrical work behind it still has to be sound.
The specified systems are listed in Schedule 1 of the Building (Specified Systems, Change the Use, and Earthquake-prone Buildings) Regulations 2005, and the Building Act 2004 adds cable cars. Our guide to compliance schedules and specified systems sets out the full SS1 to SS16 list in a table, with the systems that typically involve electrical work marked.
How the BWOF year runs with us
A BWOF year follows the compliance schedule. Inspections happen at the intervals the schedule states, faults are fixed as they are found, and records go into the logbook as the year goes on. Near the anniversary of the compliance schedule, each IQP certifies the systems they look after, and the owner signs the BWOF and supplies it to the council.
- Schedule review. We read your compliance schedule, last BWOF and logbooks to confirm which systems we inspect, the procedures and frequency for each, and the standard each one cites.
- Inspection calendar. Visits are planned around how the building is used, including tests that take emergency lighting out of service while batteries recharge.
- Inspection and testing. Each system is checked and tested to its procedure, and the results are recorded on site.
- Repairs. Anything that fails is reported to you with a price, or fixed straight away within limits you have agreed.
- Annual reporting. The signed annual reports and certificates for the systems we inspect, with any recommendation that the compliance schedule be amended.
- The BWOF itself. The owner or their agent signs the BWOF (Form 12), supplies it to the council on the anniversary date and displays a copy in the building.
Emergency lighting and exit sign testing
Emergency lighting (SS4) keeps escape routes visible when the main lighting fails. Building Code clause F6 sets how quickly it must come on and how long it must keep running, and the compliance schedule sets how often it is inspected and tested, often by reference to the joint Australian and New Zealand standard AS/NZS 2293.2. Some tests run fittings on battery, so they are timed around the building's use.
Our guide to emergency lighting testing requirements covers the Building Code durations, the six-monthly and yearly service schedules in AS/NZS 2293.2:2019 and the records the BWOF needs.
Repairs and maintenance between inspections
Specified systems have to keep performing all year, not only on inspection day. Section 105 of the Building Act 2004 makes the owner responsible for that. When a fitting fails, a battery will not hold its charge or a circuit trips, it needs fixing and the repair needs recording, because the BWOF states that the procedures were fully complied with for the previous 12 months.
BWOF inspections can sit inside a planned and predictive maintenance programme for the rest of your electrical installation, so one visit covers both. For failures between visits, our fault finding and 24/7 call-outs service covers emergency lighting circuits and the supplies to other life-safety systems.
What to send us before the first visit
Send us a copy of the current compliance schedule, the last BWOF with its Form 12A certificates, and the logbook or recent inspection records. From those we can confirm which systems we inspect, what the schedule requires for each, and whether any procedures were missed earlier in the year that need catching up before the anniversary date.
- The compliance schedule. If you can't find it, your council holds a copy.
- Last year's BWOF and Form 12As. These show who certified each system and any recommendations made.
- Logbooks and reports. Tests, faults found and repairs made during the current year.
- Building work in progress. Any fitout or consented work that adds, removes or changes a specified system.
- Site constraints. Access, security and times when emergency lighting can be tested.
What the building owner is responsible for
The owner, not the IQP or the council, is responsible for the BWOF. Under the Building Act 2004 the owner must keep each specified system performing, supply the BWOF to the council on each anniversary of the compliance schedule, display a copy where building users can see it, obtain signed annual reports from everyone who carried out the procedures, and keep those reports with the compliance schedule for two years.
Failing to supply or display a BWOF, or displaying a false or misleading one, is an offence under section 108 of the Act, with fines of up to $50,000 for an individual and $150,000 for a body corporate. Councils can also inspect buildings with a compliance schedule under section 111 and issue a notice to fix under section 164. Our guide what is a building warrant of fitness explains the yearly cycle in full.
Who carries out IQP inspections?
An independently qualified person (IQP) is someone a territorial authority has accepted as qualified to carry out or supervise the procedures for particular specified systems, and to certify that they were done. Councils register individuals, system by system, so a building often has several IQPs: one for fire alarms, one for lifts, one for the electrical systems, and so on.
Ask any IQP which specified systems they are registered for, and check on the council's search tool. Our guide to what an IQP is covers registration, Form 12A and what to ask.
Electrical inspections beyond the BWOF
A BWOF covers only the specified systems on the compliance schedule. It does not look at the rest of the electrical installation: main switchboards, distribution boards, general lighting and power circuits, or machinery supplies. If you want the whole installation checked, for a purchase, a lease or your own risk management, that is a separate commercial electrical inspection with its own report.
BWOF and IQP guides
These four guides answer the questions building owners, property managers and facilities managers ask most often about building compliance: what a BWOF certifies, what the compliance schedule and specified systems are, what an IQP does, and how emergency lighting is tested. Each one cites the legislation and council guidance it relies on.
- What is a BWOF?Who needs a building warrant of fitness, what it certifies and how the yearly cycle works.
- Compliance schedules and specified systemsWhat a compliance schedule contains, the specified systems list and which ones are electrical.
- What is an IQP?What an independent qualified person does, how IQPs are registered and what their Form 12A means.
- Emergency lighting testingHow often emergency and exit lighting is tested, what the tests involve and the records you need.
Frequently asked questions
Who needs a building warrant of fitness?
Any building with a compliance schedule needs a BWOF. Under section 100 of the Building Act 2004, a building that is not used wholly as a single household unit needs a compliance schedule if it has a specified system, such as emergency lighting, a fire alarm, a lift or mechanical ventilation, or a cable car attached to it or serving it. That takes in most commercial and industrial buildings.
How long does a BWOF last?
A BWOF covers 12 months. The owner must supply a new one to the council on each anniversary of the date the compliance schedule was issued, stating that the inspection, maintenance and reporting procedures were fully complied with during the previous 12 months. For the first year after a compliance schedule is issued, a compliance schedule statement is displayed in the building instead.
Can an electrician be an IQP?
Yes, if the territorial authority accepts them as qualified for the specified system concerned. Councils assess each applicant system by system, looking at qualifications, experience and knowledge of the Building Act and the relevant standards. Wellington City Council's criteria for emergency power systems, for example, include being a registered electrician with at least four years of relevant current industry experience.
Do you inspect every system on our compliance schedule?
Tell us which specified systems are on your compliance schedule and we'll confirm what we inspect. Many buildings have several IQPs, because councils register people for particular systems: sprinklers, backflow preventers, lifts and passive fire protection are certified by IQPs registered for those systems. We can work alongside those IQPs so the electrical supplies and controls their systems rely on are kept in order.
Sources
- Building Act 2004, sections 7, 100 to 111 and 164 (New Zealand Legislation)
- Building (Specified Systems, Change the Use, and Earthquake-prone Buildings) Regulations 2005, Schedule 1 (New Zealand Legislation)
- Building (Forms) Regulations 2004, Forms 10, 11, 12 and 12A (New Zealand Legislation)
- Building Regulations 1992, Schedule 1 (the Building Code), clause F6 (New Zealand Legislation)
- Building warrants of fitness (Wellington City Council)
- Register as an Independent Qualified Person (Wellington City Council)
- Building Warrant of Fitness (Auckland Council)
- Electricity Act 1992, section 74 (New Zealand Legislation)
- AS/NZS 2293.2:2019 Emergency lighting and exit signs for buildings, Part 2: Routine service and maintenance (Standards New Zealand)