Phase Safe Electrical upgrades, replaces and extends switchboards and distribution boards for commercial and industrial buildings across New Zealand, from bases in Wellington and Auckland. That covers main switchboards, distribution boards and sub-boards in offices, shops, hospitality venues, warehouses and workshops. We survey the board, plan the shutdown around your business, do the work as licensed electricians, then test and certify it.
What a commercial switchboard upgrade involves
A switchboard upgrade brings a board up to the protection, capacity and layout your building now needs. Sometimes that means changing parts inside the existing enclosure; sometimes the whole board is replaced. Most commercial jobs combine several of the tasks below, and the survey decides which ones your board actually needs, so you are not paying for a new board when a smaller change will do.
- Upgrades. Replacing old fuses and tired breakers with modern circuit breakers, adding protection and tidying the wiring inside the enclosure.
- Full replacement. A new enclosure and new equipment, used when the old board is damaged, unsafe, out of space or mounted on an asbestos-containing backing.
- Adding circuits and ways. A "way" is one space for a protective device. New equipment needs spare ways, and a full board often has to be extended or replaced to make room.
- RCD and RCBO protection. Residual current devices (RCDs) cut the power when current leaks to earth, which protects people from electric shock. An RCBO combines an RCD and a circuit breaker for a single circuit, so one fault does not take out a whole group of circuits.
- Sub-boards and distribution boards. A building's main switchboard often feeds smaller boards for each floor, tenancy or workshop area. We install and replace them and run the sub-mains that feed them.
- Three-phase supply changes. Adding or upgrading three-phase capacity for machinery, commercial kitchens or larger heating and cooling loads. This involves your electricity retailer and the local lines company as well as the board itself.
- Labelling. Every circuit identified at the board, so staff and future electricians can isolate the right one quickly.
If you are not sure whether you have a main switchboard, a distribution board or switchgear, our guide to the difference between a switchboard and a distribution board explains each in plain terms.
When is a switchboard upgrade due?
A switchboard is usually due for an upgrade when it shows signs of strain or no longer suits how the building is used. Common signals are breakers that trip without an obvious reason, heat or a burning smell, discoloured or damaged parts, old rewireable fuses, no RCD protection, and no spare ways for new equipment. A tenancy change, a fitout or refurbishment, new machinery or EV chargers are common triggers.
An old board is not automatically illegal: existing installations can stay in use while they are not unsafe, but any part you alter or add must meet the current wiring rules. Our guide on whether your business needs a switchboard upgrade covers the signs, triggers and rules, and a switchboard survey puts the board's condition on record before you decide.
How a switchboard job runs on a working site
A commercial switchboard job runs in five stages: a site survey, a design and quote, a planned shutdown arranged with you, the installation itself, and testing and certification before the board goes back into service. The planning stages matter most, because power to part or all of the building is off while the board is changed, and that has to fit around staff, customers and equipment.
- Survey. We look at the board, the incoming supply, the circuits it feeds and how the site runs. Possible asbestos is flagged at this point.
- Design and quote. We set out what the board will contain, which circuits get RCD protection, and any supply, metering or sub-main changes.
- Planned shutdown. We agree a date and time with you, and with the building owner or property manager where needed. Our normal hours are Monday to Friday, 7.30am to 5.00pm; talk to us about after-hours work if a daytime shutdown would stop your business.
- Installation. The old equipment comes out, the new board goes in, and circuits are reconnected and labelled.
- Testing and certification. All prescribed electrical work must be tested under the Electricity (Safety) Regulations 2010. You then receive a Certificate of Compliance (CoC) within 20 days of the work being completed, and an Electrical Safety Certificate (ESC) no later than 20 working days after the installation is reconnected.
Replacing a main switchboard usually includes connecting the mains and main earthing at the board. The regulations class that as mains work, a type of high-risk prescribed electrical work, which must also be inspected, with a record of inspection issued alongside the CoC.
How long does it take to upgrade a switchboard?
A straightforward upgrade or like-for-like replacement of a small distribution board can often be finished within a working day, with the power off for only part of it. A main switchboard replacement, a three-phase upgrade or a job with asbestos removal takes longer, and outside steps such as metering changes and network approval can add lead time before the shutdown date.
Time on site depends on the number of circuits, the condition of the wiring and access to the board. A capacity change also needs confirmation from the network before it starts. The quote states the expected shutdown length, so you can plan staff and trading around it.
What drives the cost of a switchboard upgrade
The price of a commercial switchboard upgrade depends mainly on the size of the board and the number of ways, whether the supply is single or three-phase, asbestos removal, metering or lines company work, new cabling and sub-mains, access and the timing of the shutdown, and testing and certification. Published NZ price guides from 2026 put commercial switchboard upgrades at about $5,000 to $15,000 or more, excluding GST.
Those figures are indicative only, and Phase Safe quotes every board after a survey. Our guide to what a switchboard upgrade costs in NZ sets out the published ranges, the cost drivers and how to get a firm quote.
Old and asbestos-backed switchboards
Many older switchboards and fuse boxes in New Zealand were mounted on backing boards that contain asbestos. That does not make them dangerous while left alone, but drilling, cutting or removing them can release fibres. WorkSafe treats work on these boards as asbestos-related work, and removing any friable asbestos parts needs a Class A licensed asbestos removalist.
Before work on an older board, share the building's asbestos survey or management plan with whoever is quoting. Any testing happens before the work, and the price reflects how the board has to be removed. The signs guide linked above covers who may remove what.
Where thermal imaging fits with switchboard work
Thermal imaging shows heat you cannot see by looking at a board: a loose connection, an overloaded circuit or a failing breaker running hotter than the parts around it. Our thermal imaging service scans the board while it is live and under normal load, and our electricians then repair or replace whatever it finds.
It is a useful check before choosing between repair and replacement. See thermal imaging for switchboards and electrical systems for how a scan works. Regular scans through planned maintenance catch problems between upgrades.
Industrial switchboards and sub-boards for machinery
Workshops, warehouses and light manufacturing sites usually need more from a board than an office does: three-phase supply, larger protective devices for motors and machines, and sub-boards close to the equipment they feed. When you add a machine, the board needs spare capacity and ways for it, and the sub-mains have to be sized for the load.
Our industrial electrical services page covers machinery connections, three-phase power and lighting for industrial buildings.
Switchboard guides
These three guides answer the questions business owners, facilities managers and builders most often ask before a switchboard job: what it costs, whether the board needs upgrading, and what the different boards are called. They help you brief an electrician clearly and compare quotes on the same basis.
- Switchboard upgrade costPrice ranges, what drives them and how to get a firm quote.
- Signs you need an upgradeTripping, heat, old fuses, asbestos backing, no room to grow.
- Switchboard vs distribution boardMain switchboards, distribution boards, sub-boards and switchgear explained.
Frequently asked questions
Will we lose power during a switchboard upgrade?
Yes, for part of the job. The circuits fed from the board have to be switched off while equipment is removed and reconnected, and a main switchboard replacement usually means the whole building or tenancy is off for a period. We agree the timing with you in advance, keep the shutdown as short as the work allows, and can sometimes stage the job so essential circuits come back on sooner.
Can a switchboard be upgraded without rewiring the building?
Usually, yes. A board upgrade or replacement reconnects the existing circuits to new protective devices, so the cables in walls and ceilings can often stay. Testing at the time may show circuits that are damaged, undersized or unsafe, and those need repair before the new protection will work properly. We tell you what we find and price any extra work before doing it.
Who is allowed to upgrade a switchboard in New Zealand?
Switchboard work is prescribed electrical work. Under the Electricity Act 1992, only people authorised under the Act, in practice licensed electrical workers, may do it or assist with it. The work must then be tested and certified under the Electricity (Safety) Regulations 2010. You can check any electrician's licence on the public register kept by the Electrical Workers Registration Board.
Do you work on switchboards outside business hours?
Our normal hours are Monday to Friday, 7.30am to 5.00pm. Many switchboard shutdowns can be planned within those hours with some notice, for example early in the day or at a quiet time for the business. If a daytime shutdown is not workable for your site, talk to us about after-hours work when you ask for a quote.
Sources
- Electricity Act 1992, section 74 (New Zealand Legislation)
- Electricity (Safety) Regulations 2010, regulations 59, 63, 65, 70, 74A, 74C and 74E, and the definition of mains work (New Zealand Legislation)
- Important update: changes to electricity safety regulations for electrical installations (WorkSafe, December 2025)
- Working on electrical switchboards containing asbestos, ARW 12 (WorkSafe)
- Capacity change: what your network and electrician need to provide (Meridian Energy)
