Commercial & industrial electrical services, New ZealandOffice Mon–Fri 7.30am–5.00pm · 24/7 call-outs · info@phasesafe.co.nz

BWOF guide

Compliance schedules and specified systems explained

The document behind every BWOF: what it lists, how the specified systems are numbered, and what the owner has to keep up.

Updated 16 November 2026

A compliance schedule is the council-issued document that lists every specified system in a building, such as sprinklers, fire alarms, lifts and emergency lighting, with the performance standard each must meet and the inspection, maintenance and reporting procedures that keep it working. It is the document the annual BWOF is measured against. For the electrical systems on it, see our BWOF and IQP inspections service.

What is a compliance schedule?

A compliance schedule is a document required by section 100 of the Building Act 2004 for buildings with specified systems. Section 103 sets out what it must contain: a description of each specified system, including its type and, if known, its make; the performance standards for each system; and the inspection, maintenance and reporting procedures that independently qualified persons or other people must follow so the systems keep performing.

Those procedures can be written out in full in the schedule, or identified by reference to an acceptable solution, a verification method, or a building product or method. A procedure can point to a named standard, for example the emergency lighting standard AS/NZS 2293.2, so each building follows what its own compliance schedule says.

Section 101 makes it an offence for an owner not to obtain a compliance schedule when one is required, with a fine of up to $20,000 and a further $2,000 for every day the offence continues.

What are specified systems?

Specified systems are the systems and features in or attached to a building that contribute to its proper functioning and that have been declared specified systems by Order in Council. That is the definition in section 7 of the Building Act 2004, which gives an automatic sprinkler system as its example and also includes cable cars. The declared list sits in Schedule 1 of the Building (Specified Systems, Change the Use, and Earthquake-prone Buildings) Regulations 2005.

The current Schedule 1 on New Zealand Legislation has 15 clauses, numbered 1 to 15. Councils add a sixteenth: Wellington City Council's IQP register, for example, uses SS1 to SS15 for the Schedule 1 clauses and SS16 for cable cars, which come from the Act's definition and section 100 rather than from the schedule. Wellington City Council's IQP register also splits some systems into parts, such as SS3/1 automatic doors or windows, SS3/2 access-controlled doors and SS3/3 interfaced fire or smoke doors or windows, and SS14/1 emergency power and SS14/2 signs.

The specified systems list: SS1 to SS16

The table below lists each specified system with a summary of its Schedule 1 wording (SS1 to SS15) or the Act's wording (SS16), and our view of whether it typically involves electrical work. "Yes" means the system is electrical or cannot work without electrical supply and controls. "Partly" means some installations have electrical parts and others do not. Your compliance schedule and IQPs confirm the detail for each building.

No. Specified system Typically involves electrical work?
SS1 Automatic systems for fire suppression, for example sprinkler systems Partly: pumps, alarm signalling and monitoring connections
SS2 Automatic or manual emergency warning systems for fire or other dangers Yes: detection, alarm panels, sounders and their supply
SS3 Electromagnetic or automatic doors or windows, for example ones that close when the fire alarm activates Yes: door operators, hold-open devices and alarm interfaces
SS4 Emergency lighting systems Yes: wholly electrical
SS5 Escape route pressurisation systems Yes: fans, controls and power supply
SS6 Riser mains for use by fire services No
SS7 Automatic back-flow preventers connected to a potable water supply No
SS8 Lifts, escalators, travelators or other systems for moving people or goods within buildings Yes: drives, controls and supply
SS9 Mechanical ventilation or air conditioning systems Yes: fans, motors and controls
SS10 Building maintenance units for access to exterior and interior walls Partly: powered units have motors and controls
SS11 Laboratory fume cupboards Partly: extract fans and controls
SS12 Audio loops or other assistive listening systems Yes: amplifiers, loops and power
SS13 Smoke control systems Partly: mechanical systems use fans and controls
SS14 Emergency power systems for, or signs relating to, any system in SS1 to SS13 Yes: standby power and illuminated signs
SS15 Means of escape features: (a) spoken evacuation systems, (b) final exits, (c) fire separations, (d) evacuation signs, (e) smoke separations Partly: (a) yes, (d) where signs are illuminated, (b), (c) and (e) no
SS16 Cable cars attached to or servicing a building (Building Act 2004, section 7) Yes: drive, controls and supply

SS15 features count only when they form part of a building's means of escape from fire that also contains one or more of the systems in SS1 to SS6, SS9 or SS13.

Which specified systems involve electrical work?

Emergency lighting (SS4) and emergency power and signs (SS14) are the specified systems that are electrical through and through. Fire alarms, automatic doors, escape route pressurisation, lifts, mechanical ventilation, audio loops and spoken evacuation systems all depend on electrical supply and controls. Riser mains, backflow preventers, final exits and fire or smoke separations generally have no electrical content.

The distinction matters for two reasons. First, the IQP who certifies a system is registered for that system, so a lift or fire alarm specialist may hold the IQP role while the supply circuits behind it are electrical work. Second, section 74 of the Electricity Act 1992 allows only people authorised under the Act, in practice licensed electrical workers, to do prescribed electrical work. When an inspection finds a failed circuit feeding a specified system, the repair needs a licensed electrician, and the IQP needs to see it recorded.

For emergency lighting, our guide to emergency lighting testing requirements covers how it is tested and recorded.

When is a compliance schedule issued?

A compliance schedule is usually issued after building work that installs or changes a specified system. Section 102 of the Building Act 2004 requires the building consent authority to issue it with the code compliance certificate, once it is satisfied the systems can perform to their standards. An existing building that needs a schedule but has no building work under way applies to the council under section 102A.

For a section 102A application, the owner gives the council a description of every specified system, its performance standards and the proposed inspection, maintenance and reporting procedures. Auckland Council asks for the same information about existing systems as if they were being installed under a building consent.

For the first 12 months, section 105 requires a compliance schedule statement (Form 10 under the Building (Forms) Regulations 2004) to be displayed in the building. It lists the specified systems and where the compliance schedule is kept. After that year, the annual building warrant of fitness replaces it. Our guide what is a building warrant of fitness explains that yearly cycle.

What the owner must do to keep the compliance schedule current

The owner must keep every specified system on the schedule performing to its standards, supply a BWOF every year, keep the compliance schedule in the building or another agreed place, and make it available to anyone with a right to inspect the building. Under section 110, the owner also obtains signed annual reports from everyone who carried out procedures and keeps them with the schedule for two years.

Wellington City Council's guidance adds a practical point: tenants need to know what the compliance schedule requires, such as which walls are fire separations and which routes are fire escapes, because alterations and tenancy fitouts that affect specified systems need a building consent.

How is a compliance schedule amended?

A compliance schedule is amended through the council. Section 106 lets the owner apply at any time, using Form 11, and requires an application when the owner considers an amendment necessary for the systems to keep performing, or when a change in the law makes the schedule non-compliant. The council can also amend it on its own initiative under section 107, after consulting the owner.

IQPs play a part too. Section 108(3)(d) requires any IQP recommendation to amend the schedule to be attached to the BWOF, and under section 109 the council must give the owner a chance to make submissions before deciding whether to accept it. Auckland Council lists the common triggers: a system altered, installed or removed under a building consent, or details that need updating. Auckland Council also notes that some specified systems are a Building Code requirement and cannot simply be decommissioned.

Frequently asked questions

Who issues a compliance schedule?

The building consent authority issues it after building work, together with the code compliance certificate, under section 102 of the Building Act 2004. Where no building consent is involved, the owner applies to the territorial authority, which is the city or district council, under section 102A. Only the council can amend a compliance schedule once it is issued.

How do I get a copy of my building's compliance schedule?

Ask the building's owner or manager first, since the schedule must be kept in the building or another agreed place. Your council also holds a copy. Wellington City Council, for example, has an online compliance schedule search; elsewhere, ask your council for a copy. Send it to any IQP pricing inspections.

What is the compliance schedule handbook?

The Compliance Schedule Handbook is guidance on compliance schedules and specified systems published by MBIE on its Building Performance website. Councils point owners to MBIE guidance on matters such as missed inspections. It is guidance, not law: the Building Act 2004, the regulations made under it and your building's own compliance schedule are what you must follow.

Sources